Ditch of soil with triangular cross-section (symmetrical): 3-A or 3-B or 3-C

Please fill the form below:

Runoff coefficient [C]:

Rainfall intensity [I]:

mm/h

Impluvium width [B]:

m

Warning: the results obtained with the application are the engineer in charge of the work responsibility. The authors are not responsible for the use of the software.

Authors: Oscar Camilo Valderrama Riveros, Julián Andrés Pulecio Díaz