Ditch of concrete with triangular cross-section (nonsymmetrical): 1-A or 1-B or 1-C

Please fill the form below:

Runoff coefficient [C]:

Rainfall intensity [I]:

mm/h

Impluvium width [B]:

m

Warning: the results obtained with the application are the engineer in charge of the work responsibility. The authors are not responsible for the use of the software.

Authors: Oscar Camilo Valderrama Riveros, Julián Andrés Pulecio Díaz